Storheia wind farm

Article

October 17, 2021

Storheia wind farm is located in Åfjord municipality in Trøndelag. 80 Vestas V117 turbines of 3.6 MW each have been installed. Tower height is 87 meters, rotor diameter is 117 meters. Total power is 288 MW. Annual production is estimated at 1000 GWh. The wind farm covers an area of ​​just under 38 square kilometers. The access road and internal roads are a total of approximately 62 kilometers. The power plant was completed in the autumn of 2019. On 11 August, the last turbine was installed. Statkraft was responsible for the development and is the majority owner of Fosen Vind. The Grand Chamber of the Supreme Court unanimously ruled on 11 October 2021 that the rights of the reindeer herding Sami under Article 27 of the UN Convention on Civil and Political Rights (SP) had been violated. This means that the license and the expropriation decisions on the development of Storheia and Roan wind turbines were invalid.

References

Sources

«NVE Atlas». Wind turbine - expanded. Norwegian Water Resources and Energy Directorate NVE wind turbine The waterfall winds around Storheia TU: Last turbine in place in Storheia wind farm

INSERT INTO `wiki_article`(`id`, `article_id`, `title`, `article`, `img_url`) VALUES ('NULL()','Storheia_vindpark','Storheia wind farm','TU: Last turbine in place in Storheia wind farm','')